Case Study: Double E

(SPOT Tracker and TruQC have joined forces to become TRU, a Jones Company)

PROJECT SNAPSHOT

Customer: Summit Midstream
Location: West Texas
Year: 2020-2021
Assets Tracked: 135 miles of 42” and 30” pipeline, including fittings for the pipeline

PROJECT SCOPE

OPERATIONAL PROGRESS

CUSTOM WORKFLOWS

DASHBOARD REPORTING

SPOT worked with Summit Midstream on the 135-mile Double E project in West Texas. The SPOT team was tasked with tracking pipe, fittings, and all materials on above-ground structures from the mill to the ROW, including interconnect meter locations. The SPOT platform was used to implement custom workflows, capture operational progress, & forecast completion date(s) through dashboard reporting.

The SPOT and Summit Midstream teams spent many hours customizing a system that would meet Summit’s goals. SPOT techs were onsite for the duration of the project to support inspection staff and material management staff, ensuring all data was captured correctly. The result was a complete deliverable using 3-D modeling with overlaid materials information referencing back to the SPOT database.

Share This Resource
Other Resources
Design for Momentum: Give People the Experience of Winning. Frequently.
July 6, 2026

By Darryl Brown In the last post I wrote about removing repetitive manual work from our process. In the post before that, about reducing […]

Read More
Valuable Metrics: Numbers That Don’t Change Behavior Are Noise
June 22, 2026

By Darryl Brown Every change we made over the last two years was an experiment. We had a hypothesis that simplifying our pipeline would […]

Read More
Eliminate and Automate: Reserve Humans for Critical Thinking
June 8, 2026

By Darryl Brown The mantra that shaped a lot of our thinking over the last two years was simple: eliminate, automate, or delegate. In […]

Read More
Time to give TRU a try?

Get in touch to schedule a demo at your convenience.