Case Study: Double E
(SPOT Tracker and TruQC have joined forces to become TRU, a Jones Company)
PROJECT SNAPSHOT
Customer: Summit Midstream
Location: West Texas
Year: 2020-2021
Assets Tracked: 135 miles of 42” and 30” pipeline, including fittings for the pipeline
PROJECT SCOPE
OPERATIONAL PROGRESS
CUSTOM WORKFLOWS
DASHBOARD REPORTING
SPOT worked with Summit Midstream on the 135-mile Double E project in West Texas. The SPOT team was tasked with tracking pipe, fittings, and all materials on above-ground structures from the mill to the ROW, including interconnect meter locations. The SPOT platform was used to implement custom workflows, capture operational progress, & forecast completion date(s) through dashboard reporting.
The SPOT and Summit Midstream teams spent many hours customizing a system that would meet Summit’s goals. SPOT techs were onsite for the duration of the project to support inspection staff and material management staff, ensuring all data was captured correctly. The result was a complete deliverable using 3-D modeling with overlaid materials information referencing back to the SPOT database.